PropertyValue
rdf:type
rdfs:label
  • USS Prevail (AM-107)
rdfs:comment
  • Prevail, a steel-hulled minesweeper, was named after the word "prevail," meaning to gain ascendancy through strength or superiority. Prevail was laid down by Pennsylvania Shipyards Inc., Beaumont, Texas, 15 November 1941; launched 13 September 1942; sponsored by Mrs. T. B. Moran; and commissioned 17 April 1943, Comdr. A. V. Wallis, USNR, in command.
owl:sameAs
dcterms:subject
dbkwik:military/property/wikiPageUsesTemplate
Ship image
  • 300
module
  • --04-01
  • --11-15
abstract
  • Prevail, a steel-hulled minesweeper, was named after the word "prevail," meaning to gain ascendancy through strength or superiority. Prevail was laid down by Pennsylvania Shipyards Inc., Beaumont, Texas, 15 November 1941; launched 13 September 1942; sponsored by Mrs. T. B. Moran; and commissioned 17 April 1943, Comdr. A. V. Wallis, USNR, in command.