PropertyValue
rdfs:label
  • Project design flood
rdfs:comment
  • The project design flood is a hypothetical "maximum probable" flood of the Mississippi River used by the United States Army Corps of Engineers to aid in the design and execution of flood protection in the Mississippi Valley. Once the project design flood was developed, flow rates at critical points are used to determine how high levees need to be, how deep the dredging needs to be, and the flowrates at which flood control structures need to be used.
owl:sameAs
dcterms:subject
dbkwik:military/property/wikiPageUsesTemplate
abstract
  • The project design flood is a hypothetical "maximum probable" flood of the Mississippi River used by the United States Army Corps of Engineers to aid in the design and execution of flood protection in the Mississippi Valley. The current project design flood was developed in 1956 by the Mississippi River Commission with input from the Weather Bureau. It is based on a scenario of three rain events in the lower Mississippi Valley occurring 3 days apart: the January 1937 (increased by 10%), January 1950, and then the February 1938 rain event with its center adjusted to the north and rainfall pattern rotated to achieve a hypothetical worst-case flood of the tributaries of the Mississippi River. Assumptions were made based on the completion of tributary reservoirs and dams by 1960. When the Commission reviewed the plan after the 1973 Mississippi River floods, the Project Design Flood in use was determined to be "based on sound technology that was still reliable by current standards. The project design flood peak discharges remained unchanged." Once the project design flood was developed, flow rates at critical points are used to determine how high levees need to be, how deep the dredging needs to be, and the flowrates at which flood control structures need to be used.