Property | Value |
rdf:type | |
rdfs:label | - Geothermal Plant
- Geothermal plant
|
rdfs:comment | - The Geothermal Plant was a part of the Republic detention facility located in the Maximum Security Section of the Belsavis prison.
- A Geothermal Plant is an infrastructure building in Tropico 5. Geothermal plant do not require roads and effectively obsoletes Fossil-Fuel Power Plant, Tidal Power Plant and Nuclear Power Plant in terms of power production efficiency, employment, economy and environmental variances. On average budget, a single Geothermal Plants' base power production is equivalent to two Fossil-Fuel Plants (or four Tidal Plants) on maximum budget. Four upgraded maximum budget Geothermal Plants, when place on volcanic tile, can outproduce a single on maximum budget Nuclear Plant at half the operational costs of importing cost-prohibitive Uranium.
- Geothermal Plant is the first solo campaign level in Tom Clancy's Splinter Cell: Double Agent (Version 1). Splinter Cell agent Sam Fisher and rookie Splinter Cell agent John Hodge must infiltrate a Geothermal Plant in Iceland to investigate suspicious activity. This mission is notable in that it is the last 'official mission' Sam Fisher participated in as a Splinter Cell agent for Third Echelon, before doing double agent missions for the NSA during the JBA Crisis in 2008.
|
Era | |
dcterms:subject | |
Row 9 info | |
Row 8 info | |
Row 4 info | |
Row 10 title | |
Row 7 title | |
Row 1 info | |
Row 8 title | |
Row 4 title | |
Row 9 title | |
Row 2 info | |
Row 6 info | |
Row 1 title | |
Row 5 info | |
Row 2 title | |
Row 6 title | |
Row 10 info | |
Row 5 title | |
Row 3 info | |
Row 3 title | |
Row 7 info | |
dbkwik:starwars/property/wikiPageUsesTemplate | |
dbkwik:tropico/property/wikiPageUsesTemplate | |
Box Title | |
Date | |
Affiliation | |
Game | - Splinter Cell: Double Agent
|
Name | |
Image size | |
dbkwik:splintercell/property/wikiPageUsesTemplate | |
PREV | |
Image File | - Geothermal_Power_Plant.png
|
NEXT | |
Objective | - Investigate suspicious activities at the geothermal plant.
|
Location | |
abstract | - The Geothermal Plant was a part of the Republic detention facility located in the Maximum Security Section of the Belsavis prison.
- A Geothermal Plant is an infrastructure building in Tropico 5. Geothermal plant do not require roads and effectively obsoletes Fossil-Fuel Power Plant, Tidal Power Plant and Nuclear Power Plant in terms of power production efficiency, employment, economy and environmental variances. On average budget, a single Geothermal Plants' base power production is equivalent to two Fossil-Fuel Plants (or four Tidal Plants) on maximum budget. Four upgraded maximum budget Geothermal Plants, when place on volcanic tile, can outproduce a single on maximum budget Nuclear Plant at half the operational costs of importing cost-prohibitive Uranium.
- Geothermal Plant is the first solo campaign level in Tom Clancy's Splinter Cell: Double Agent (Version 1). Splinter Cell agent Sam Fisher and rookie Splinter Cell agent John Hodge must infiltrate a Geothermal Plant in Iceland to investigate suspicious activity. This mission is notable in that it is the last 'official mission' Sam Fisher participated in as a Splinter Cell agent for Third Echelon, before doing double agent missions for the NSA during the JBA Crisis in 2008.
|
is PREV of | |
is NEXT of | |