PropertyValue
rdf:type
rdfs:label
  • Geothermal Plant
  • Geothermal plant
rdfs:comment
  • The Geothermal Plant was a part of the Republic detention facility located in the Maximum Security Section of the Belsavis prison.
  • A Geothermal Plant is an infrastructure building in Tropico 5. Geothermal plant do not require roads and effectively obsoletes Fossil-Fuel Power Plant, Tidal Power Plant and Nuclear Power Plant in terms of power production efficiency, employment, economy and environmental variances. On average budget, a single Geothermal Plants' base power production is equivalent to two Fossil-Fuel Plants (or four Tidal Plants) on maximum budget. Four upgraded maximum budget Geothermal Plants, when place on volcanic tile, can outproduce a single on maximum budget Nuclear Plant at half the operational costs of importing cost-prohibitive Uranium.
  • Geothermal Plant is the first solo campaign level in Tom Clancy's Splinter Cell: Double Agent (Version 1). Splinter Cell agent Sam Fisher and rookie Splinter Cell agent John Hodge must infiltrate a Geothermal Plant in Iceland to investigate suspicious activity. This mission is notable in that it is the last 'official mission' Sam Fisher participated in as a Splinter Cell agent for Third Echelon, before doing double agent missions for the NSA during the JBA Crisis in 2008.
Era
dcterms:subject
Row 9 info
  • Electricity
Row 8 info
Row 4 info
  • College
Row 10 title
  • Influence
Row 7 title
  • Base Power Production
Row 1 info
  • 15000.0
Row 8 title
  • Era Unlocked
Row 4 title
  • Worker Education
Row 9 title
  • Research Required
Row 2 info
  • $150 to $260
Row 6 info
  • Well-off to Filthy Rich
Row 1 title
  • Cost
Row 5 info
  • 35
Row 2 title
  • Budget
Row 6 title
  • Wealth Provided
Row 10 info
Row 5 title
  • Job Quality
Row 3 info
  • 8
Row 3 title
  • Max Workers
Row 7 info
  • 50
dbkwik:starwars/property/wikiPageUsesTemplate
dbkwik:tropico/property/wikiPageUsesTemplate
Box Title
  • Geothermal Plant
Date
  • --09-03
Affiliation
Game
  • Splinter Cell: Double Agent
Name
  • Geothermal Plant
Image size
  • 300
dbkwik:splintercell/property/wikiPageUsesTemplate
PREV
Image File
  • Geothermal_Power_Plant.png
NEXT
Objective
  • Investigate suspicious activities at the geothermal plant.
Location
abstract
  • The Geothermal Plant was a part of the Republic detention facility located in the Maximum Security Section of the Belsavis prison.
  • A Geothermal Plant is an infrastructure building in Tropico 5. Geothermal plant do not require roads and effectively obsoletes Fossil-Fuel Power Plant, Tidal Power Plant and Nuclear Power Plant in terms of power production efficiency, employment, economy and environmental variances. On average budget, a single Geothermal Plants' base power production is equivalent to two Fossil-Fuel Plants (or four Tidal Plants) on maximum budget. Four upgraded maximum budget Geothermal Plants, when place on volcanic tile, can outproduce a single on maximum budget Nuclear Plant at half the operational costs of importing cost-prohibitive Uranium.
  • Geothermal Plant is the first solo campaign level in Tom Clancy's Splinter Cell: Double Agent (Version 1). Splinter Cell agent Sam Fisher and rookie Splinter Cell agent John Hodge must infiltrate a Geothermal Plant in Iceland to investigate suspicious activity. This mission is notable in that it is the last 'official mission' Sam Fisher participated in as a Splinter Cell agent for Third Echelon, before doing double agent missions for the NSA during the JBA Crisis in 2008.
is PREV of
is NEXT of