PropertyValue
rdf:type
rdfs:label
  • French submarine Triomphant (S616)
rdfs:comment
  • The first sheet of Triomphant was cut at DCN Cherbourg in October 1986, and her engine was shipped to her from DCN Indret five years later. The reactor was built into the vessel in August 1991, with the fore and aft sections being welded on in January and April 1992 respectively. She was armed and given a commander in May 1992 and moved from the assembly site to the completion basin in July 1993. Her launch in March 1994 was followed by her first dive that June and her trip from DCN Cherbourg to lle Longue that July down the "free route" between Cherbourg and Brest, with a crew of 110 and engineers from DCN Cherbourg. On 4 January 1995, during testing, she reached her maximum depth for the first time and made her first firing of a ballistic missile the following month. Photographs of her w
owl:sameAs
dcterms:subject
dbkwik:military/property/wikiPageUsesTemplate
Ship caption
  • Téméraire, sister-ship of Triomphant
Ship image
  • 200
module
  • --06-09
abstract
  • The first sheet of Triomphant was cut at DCN Cherbourg in October 1986, and her engine was shipped to her from DCN Indret five years later. The reactor was built into the vessel in August 1991, with the fore and aft sections being welded on in January and April 1992 respectively. She was armed and given a commander in May 1992 and moved from the assembly site to the completion basin in July 1993. Her launch in March 1994 was followed by her first dive that June and her trip from DCN Cherbourg to lle Longue that July down the "free route" between Cherbourg and Brest, with a crew of 110 and engineers from DCN Cherbourg. On 4 January 1995, during testing, she reached her maximum depth for the first time and made her first firing of a ballistic missile the following month. Photographs of her were exhibited to the Senate of France from 15 to 23 May 1995. In June she set off back to Cherbourg for Post-Testing Upgrades (Remises A Niveau Après Essais or RANAE), then set off for a second set of trials, making 1,300 hours of test dives in total and a five-week trip. She then spent five weeks in maintenance at Cherbourg and during her main weapons tests took on 11 torpedo models, five trial torpedoes and one Exocet SM39 exercise. As a deterrent system, a salvo of 15 models was successfully launched and, in the last round of development, she functioned successfully as a missile platform even if her engine did not achieve its best. She left Cherbourg on 7 March 1996 for her second round of trials, with the final tests of her nuclear boiler coming on 12 July and of her weapons systems on 26 August.[citation needed]