Construction of the Striker was completed on reference stardate 2/1702, in the latter part of the 2270s decade. This vessel was commissioned at one of the the shipyards that produced Reliant-class vessels, either Morena Shipyards, Sol IV Fleet Yards or Salazaar Shipyards. (FASA RPG module: Federation Ship Recognition Manual)
Construction of the Striker was completed on reference stardate 2/1702, in the latter part of the 2270s decade. This vessel was commissioned at one of the the shipyards that produced Reliant-class vessels, either Morena Shipyards, Sol IV Fleet Yards or Salazaar Shipyards. (FASA RPG module: Federation Ship Recognition Manual)