PropertyValue
rdfs:label
  • USS Canadara
rdfs:comment
  • Construction of the Canadara was completed on reference stardate 2/9501, in the latter part of the 2350s decade. This vessel was commissioned at one of the two shipyards that produced Paine-class vessels, either Deneva Shipyards or Gibraltar Shipyards. (FASA RPG module: Star Trek: The Next Generation Officer's Manual)
dcterms:subject
dbkwik:memory-beta/property/wikiPageUsesTemplate
Status
  • active
Launched
Affiliation
Registry
  • NCC-9012
Name
  • USS Canadara
Type
  • fed
abstract
  • Construction of the Canadara was completed on reference stardate 2/9501, in the latter part of the 2350s decade. This vessel was commissioned at one of the two shipyards that produced Paine-class vessels, either Deneva Shipyards or Gibraltar Shipyards. (FASA RPG module: Star Trek: The Next Generation Officer's Manual)