About: STS-74   Sponge Permalink

An Entity of Type : dbkwik:resource/G7YR4yAvfoe7I_ap4nmguQ==, within Data Space : dbkwik.webdatacommons.org associated with source dataset(s)

STS-74 was the fourth mission of the US/Russian Shuttle-Mir Program, and the second docking of the Space Shuttle with Mir. Space Shuttle Atlantis lifted off from Kennedy Space Center launch pad 39A on 12 November 1995. The mission ended 8 days later with the landing of Atlantis back at Kennedy. It was the second in a series of seven straight missions to the station flown by Atlantis.

AttributesValues
rdf:type
rdfs:label
  • STS-74
rdfs:comment
  • STS-74 was the fourth mission of the US/Russian Shuttle-Mir Program, and the second docking of the Space Shuttle with Mir. Space Shuttle Atlantis lifted off from Kennedy Space Center launch pad 39A on 12 November 1995. The mission ended 8 days later with the landing of Atlantis back at Kennedy. It was the second in a series of seven straight missions to the station flown by Atlantis.
sameAs
COSPAR ID
  • 1995(xsd:integer)
dcterms:subject
dbkwik:nasa/proper...iPageUsesTemplate
crew4 up
  • Jerry L. Ross
Previous Mission
crew size
  • 5(xsd:integer)
landing date
  • --11-20
flights1 up
  • Third
SATCAT
  • 23714(xsd:integer)
Mission Duration
  • 707502.0
crew photo caption
  • Left to right: Halsell, Cameron; Standing: McArthur, Ross, Hadfield
Name
  • STS-74
agency3 up
  • CSA
crew1 up
  • Kenneth D. Cameron
crew3 up
  • Chris A. Hadfield
terminology
  • Astronaut
Insignia
  • Sts-74-patch.png
Image caption
  • Atlantis docked to Mir
crew photo
  • STS-74_crew.jpg
orbit period
  • 5544.0
orbit inclination
  • 51(xsd:double)
crew2 up
  • James D. Halsell
docking
  • --11-15
Operator
flights3 up
  • First
launch site
crew5 up
  • William S. McArthur, Jr.
Mission Type
flights2 up
  • Second
landing site
apsis
  • gee
orbit regime
Programme
Launch date
  • --11-12
flights4 up
  • Fifth
crew members
Position
  • Pilot
  • Commander
  • Mission Specialist 1
  • Mission Specialist 2
  • Mission Specialist 3
orbits completed
  • 128(xsd:integer)
flights5 up
  • Second
Next Mission
orbit reference
abstract
  • STS-74 was the fourth mission of the US/Russian Shuttle-Mir Program, and the second docking of the Space Shuttle with Mir. Space Shuttle Atlantis lifted off from Kennedy Space Center launch pad 39A on 12 November 1995. The mission ended 8 days later with the landing of Atlantis back at Kennedy. It was the second in a series of seven straight missions to the station flown by Atlantis. The shuttle delivered a pair of solar arrays along with the Russian-built Mir Docking Module to allow docking with the station by the space shuttle without moving Mir's Kristall module. During the three-day docking, the Russian, Canadian, and American crew transferred supplies and equipment between Atlantis and Mir, moved several long-term experiments, and upgraded the station with new equipment, particularly during the installation of the docking module.
is Previous Mission of
is Missions of
is Mission of
is Next Mission of
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software