PropertyValue
rdfs:label
  • London Underground infrastructure
rdfs:comment
  • Based on the Wikipedia page [1]. The infrastructure of the London Underground includes 11 lines, with 270 stations. There are two types of line on the London Underground: services that run on the sub-surface network that is just below the surface and use larger trains, or the deep-tube lines, that are for the most part self-contained and use smaller trains. Most of the lines emerge onto the surface outside the central area. The oldest train running on the Underground was introduced in 1972. The Underground is electrified using a four-rail system, the DC traction supply being independent of the running rails. Planned improvements include new stations, line extensions and more lines with automatic train operation (ATO).
  • The infrastructure of the London Underground includes 11 lines, which serve 268 stations by rail. Lines on the Underground can be classified into two types: subsurface and deep-level. Lines of both types usually emerge onto the surface outside the central area. While the tube lines are for the most part self-contained, the subsurface lines are part of an interconnected network. The Underground uses rolling stock built between 1960 and 2005. The Underground is one of the few networks in the world that uses a four-rail system. The additional rail carries the electrical return that on third-rail and overhead networks is provided by the running rails. Planned improvements include new stations, line extensions, computerised signalling, automatic train operation (ATO), track replacement, new rol
owl:sameAs
dcterms:subject
dbkwik:london/property/wikiPageUsesTemplate
dbkwik:uk-transport/property/wikiPageUsesTemplate
dbkwik:uktransport/property/wikiPageUsesTemplate
abstract
  • Based on the Wikipedia page [1]. The infrastructure of the London Underground includes 11 lines, with 270 stations. There are two types of line on the London Underground: services that run on the sub-surface network that is just below the surface and use larger trains, or the deep-tube lines, that are for the most part self-contained and use smaller trains. Most of the lines emerge onto the surface outside the central area. The oldest train running on the Underground was introduced in 1972. The Underground is electrified using a four-rail system, the DC traction supply being independent of the running rails. Planned improvements include new stations, line extensions and more lines with automatic train operation (ATO).
  • The infrastructure of the London Underground includes 11 lines, which serve 268 stations by rail. Lines on the Underground can be classified into two types: subsurface and deep-level. Lines of both types usually emerge onto the surface outside the central area. While the tube lines are for the most part self-contained, the subsurface lines are part of an interconnected network. The Underground uses rolling stock built between 1960 and 2005. The Underground is one of the few networks in the world that uses a four-rail system. The additional rail carries the electrical return that on third-rail and overhead networks is provided by the running rails. Planned improvements include new stations, line extensions, computerised signalling, automatic train operation (ATO), track replacement, new rolling stock, new cooling systems, and mobile phone coverage underground.