PropertyValue
rdf:type
rdfs:label
  • USS Sturgeon (SSN-637)
rdfs:comment
  • The contract to build Sturgeon was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 30 November 1961 and her keel was laid down there on 10 August 1963. She was launched on 26 February 1966, sponsored by Mrs. Everett Dirkson, the wife of United States Senator Everett Dirksen (1896–1969) of Illinois, and commissioned on 3 March 1967, with Commander Curtis B. Shellman, Jr., in command. File:USS_Sturgeon_Mrs_Everett_Dirkson_.jpg File:USS Sturgeon (SSN-637) Launch.jpg File:USS_Sturgeon_(SSN-637)_Launch2.jpg
owl:sameAs
dcterms:subject
dbkwik:military/property/wikiPageUsesTemplate
Ship caption
  • USS Sturgeon
module
  • --11-30
abstract
  • The contract to build Sturgeon was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 30 November 1961 and her keel was laid down there on 10 August 1963. She was launched on 26 February 1966, sponsored by Mrs. Everett Dirkson, the wife of United States Senator Everett Dirksen (1896–1969) of Illinois, and commissioned on 3 March 1967, with Commander Curtis B. Shellman, Jr., in command. File:USS_Sturgeon_Mrs_Everett_Dirkson_.jpg File:USS Sturgeon (SSN-637) Launch.jpg File:USS_Sturgeon_(SSN-637)_Launch2.jpg